Whether there is an accessible substation near the site, how far is it, what is the voltage level, what is the capacity, and whether there is any gap; It will increase the cost, and most areas can only access 30%-50% of the capacity.) After the communication, the first thing to prepare is to understand the relevant local policies. For example, what is the scale index given by the state to the province? Does the province have a separate subsidy policy for the project? Learn as much as you can about policies like this. If you can know whether there is a completed project in the project location, what is the benefit? It would be even better if there are projects under construction and to what extent. Finally, a set of hard-wearing and scratch-resistant clothing and comfortable sneakers are also essential.
After the above-mentioned problems are solved, use GPS to mark several points around several boundary points of the site to basically delineate the site range. At the same time, it is necessary to look at the geological conditions of the site from various angles. Because the site area is too large, you can't see the whole picture from a boundary point, and you may ignore many important factors.
JS SOLAR was established in 2007 and is located in Wuxi City. Specializing in the production of solar products, such as solar cells, solar photovoltaic panels, solar inverters, mounting systems, etc.
Our automation equipment is imported from Germany, Italy, Japan and other countries... More